The Grange University Hospital, Cwmbran, Wales, UK

  • Typ objektu:
  • Budovy pre zdravotníctvo
Celá obrazovka Zatvor Street View

The 560 bed £350m Grange University Hospital opened ahead of schedule in November 2020 with zero defects in time to help the NHS Trust to respond to the winter season pressures and the second wave of Covid-19.

This was made possible using a DfMA approach to which Peikko DELTABEAM® and Column Shoes played an integral part. Working the contractor Laing O’Rourke and the structural engineers WSP Peikko designed & supplied over 550nr DELTABEAM®’s to the project. So, helping achieve the target of over 70% of the components to be manufactured offsite. The use of DELTABEAM® along with Peikko column shoes & anchor bolts allowed for minimal propping making construction both fast & safer. Therefore, playing a major role in the 23% program saving, including over 237,000 working hours.

Čítajte viac down-arrow.png

The hospital opened ahead of schedule on 17th November 2020 to help us respond to winter season pressures and the second wave of COVID-19

NHS Wales

Informácie o projekte

Podlažia:
Three suspended floors and roof
Developer:
Aneurin Bevan University Health Board
Stavebná spoločnosť:
Laing O’Rourke
Statik:
WSP Cardiff
Architekt:
BDP
Výrobca betónových prebafrikátov:
Explore Manufacturing
Rok dodania produktov:
2018
Rok ukončenenia výstavby:
2020