Khalifa Port Warehouses, Jebel Ali, UAE

  • Typ objektu:
  • Sklady
Celá obrazovka Zatvor

Khalifa Port is the flagship state of the art gateway to Abu Dhabi and handles all of Abu Dhabi's container traffic. The four main warehouses of the Port handle 12 million tons of cargo, and their flooring is done by Peikko's TERAJOINT® Solution.

Khalifa Port has the first semi-automated container terminal in the region. The offshore port has been constructed on a Port Island with an offshore area extending over 2,7 km2s and the container terminal situated more than four kilometers out to sea.

The warehouses have a reinforced moment resisting concrete frame; all the lateral loads are transferred through the floors and resisted by beams and columns. Concrete floors, beams and columns are reinforced and cast in-situ. The entire systems rests on piles centric with columns. At the roof level there is a steel structure enclosure mounted on the corbel at four locations.

Čítajte viac down-arrow.png

Informácie o projekte

Veľkosť projektu:
41000 m2
Veľkosť projektu:
441000 ft2
Developer:
Abu Dhabi Ports Operating Company
Stavebná spoločnosť:
Jedar Flooring Contracting / Züblin Construction LLC
Architekt:
ProfessorPfeiferandPartner
Rok dodania produktov:
2011
Rok ukončenenia výstavby:
2012

Poskytnuté riešenie

Kontakty

Nirajuthan Selvarajah

Nirajuthan Selvarajah

[email protected]